Roof Bolting by contractually in between 27L & 29L/13D & 15D to strengthen the roof for cleaning of fallen coal and development along 13D & 14D/in bet. 28L & 29L in Kenda seam of Jambad UG Colliery.
New base plate making for 12.5 ft x 4.5 ft for 150HP, 550V motor including alignment of pump motor set suitable suction & delivery bend, coupling, reducer making and other miscellaneous work. At Lakhimata Colliery
Hiring of HEMM for removal and Transportation of 1599.65 L.Cum of In-situ OB and 98.53 L.Cum of Re-handling OB, Nakrakonda-Kumardihi B OCP (3MTY) under Bankola Area.
Pit bottom Sump Cleaning at C- Pit of Kenda(R-VI) seam of Bansra Colliery.
29-Jun-2024
19-Jul-2024 upto 13:00 Hrs.
19-Jul-2024 at 15:00 Hrs.
15
ECL/HQ/CMC/2024/BC/302, dt. 29-Jun-2024
Transportation of sand from PirthanGhat and RamnagarGhat of Ajoyriver to Bunker No. 2, Bunker No. 4, Bunker No. 5 and Bunker No. 6 of Bankola Colliery for a period of Two Years.
29-Jun-2024
NA
15-Jul-2024 at 13:30 Hrs.
16
SS/GM/AMPCD/TIMBER/24-25/108/112, dt. 29-Jun-2024
Engagement of contractual tipper for transportation of mining timber from different depots of WBFDCL.
29-Jun-2024
NA
09-Jul-2024 at 17:30 Hrs.
17
GM-PA/AE(C)/e-Tender/24-25/03/67, dt. 29-Jun-2024
Urgent repairing of Pit Bath behind Pit-2 office for shifting of Cap Lamp room under Khottadih Colliery.
29-Jun-2024
15-Jul-2024 upto 17:00 Hrs.
16-Jul-2024 at 17:00 Hrs.
18
ECL/GM/JNR/EnM/A2/24-25/41, dt. 27-Jun-2024
Fabrication and Transportation of One 90m Head 500 GPM Pump with 90 kW Motor, Including All Valves, Bends, and Associated Electricals from Surface, and Installation at 23L/23D Dip with Required 820m 4-Inch Pipeline at R-VI Seam at MIC, JPC.
29-Jun-2024
15-Jul-2024 upto 11:00 Hrs.
16-Jul-2024 at 11:00 Hrs.
19
GM/JNR/E&M/B2/TENDER/24-25/30, dt. 27-Jun-2024
Electrical Wiring including supply of fitting of Newly Constructed Room for B.R. Ambedkar Statue in front of ECO park under Jhanjra Area.
29-Jun-2024
15-Jul-2024 upto 11:00 Hrs.
15-Jul-2024 at 11:30 Hrs.
20
GM/JNR/E&M/B2/TENDER/24-25/29, dt. 27-Jun-2024
Tit-bit electrical installation and fitting of LED bulb with Glass Globe set and others materials at GM Bungalow under Jhanjra Area.
29-Jun-2024
15-Jul-2024 upto 11:00 Hrs.
15-Jul-2024 at 11:30 Hrs.
21
GM/JNR/E&M/B2/TENDER/24-25/28, dt. 27-Jun-2024
Transportation, replacement and salvaging of one no. damaged Driven Drum with the identical spare Driven Drum in -1 Dip Conveyor at MIC, Jhanjra Project Colliery.
29-Jun-2024
15-Jul-2024 upto 11:00 Hrs.
15-Jul-2024 at 11:30 Hrs.
22
GM/JNR/E&M/B2/TENDER/24-25/27, dt. 27-Jun-2024
Repairing and rewinding of one no. Air cooled 30KVA 550V/80-110V Welding Machine Sl.No. 90094 of 3&4 Incline, Jhanjra Project Colliery.
29-Jun-2024
15-Jul-2024 upto 11:00 Hrs.
15-Jul-2024 at 11:30 Hrs.
23
KOCP/E&M/TN/24-25/11, dt. 28-Jun-2024
Extension/erection of 3.3 KV OHL for coal face pump (Dewatering of mine) in mine at KTD OCP.
29-Jun-2024
07-Jul-2024 upto 10:00 Hrs.
07-Jul-2024 at 11:00 Hrs.
24
ECL/GM/MA/E&M /24-25/52, dt. 29-Jun-2024
Re-winding of Ceiling Fan & Exhaust fan. Quantity-20 Nos.
Cleaning of fallen coal at 3 level from 1 south dip to 2 south dip. 2 south dip from 3 level to 10 level & 10 level from 2 south dip to 7 south dip in Lower Kajora (R-VIIIA) seam, No.10 pit of Khas Kajora Colliery.
1. 150 HP pump & motor dismantling & lowering & fitting at B.P seam at Lakhimata Colliery. 2. Pump loading on T/Truck from Area store mugma Area & unloading at Nirsha Colliery.
29-Jun-2024
08-Jul-2024 upto 12:30 Hrs.
09-Jul-2024 at 10:30 Hrs.
31
MSAM/E&M/STN/24-25/66, dt. 29-Jun-2024
REPAIRING OF DAMAGED ARM LINK FOR THE USE IN SDL EIMCO ELECON MAKE MACHINE AT MANDERBONI COLLIERY UNDER PANDAVESWAR AREA.
Complete repairing of Tippler of Parasea Colliery.
29-Jun-2024
NA
16-Jul-2024 at 16:30 Hrs.
36
ECL/GM/BA/E-TENDER/24-25/Enm/75, dt. 28-Jun-2024
Installation, testing and commissioning of 500KVA 11KV440Volt transformer at Moira Colliery 11KV Sub-station with repairing/ rewinding of 600KVA 11KV440Volt transformer.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
37
ECL/GM/BA/E-TENDER/24-25/Enm/74, dt. 28-Jun-2024
Salvaging of material from old section S6 RVIII B panel to new section S7 RVIII B panel of no1 incline of Bankola Colliery.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
38
ECL/GM/BA/E-TENDER/24-25/Enm/73, dt. 28-Jun-2024
Construction of 220Volt overhead line from 11KV main substation to UriaDhowrah and fan house of Bankola Colliery.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
39
ECL/GM/BA/E-TENDER/24-25/Enm/72, dt. 28-Jun-2024
Complete repairing of Drum with Clutch and Brake bend AKGI make 50HP 550V Direct haulage of Bankola Colliery.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
40
ECL/GM/BA/E-TENDER/24-25/Enm/71, dt. 28-Jun-2024
Repairing of existing lighting line from KumardihiA village to Bankola Colliery rail gate under Bankola Area.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
41
ECL/GM/BA/E-TENDER/24-25/Enm/70, dt. 28-Jun-2024
Minor repairing of 02twonos4UP3 stage pumps of Bankola Colliery.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
42
ECL/GM/BA/E-TENDER/24-25/Enm/69, dt. 28-Jun-2024
Lifting and lowering of 80HP submersible pump running at water treatment plant under Bankola Area.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
43
ECL/GM/BA/E-TENDER/24-25/Enm/68, dt. 28-Jun-2024
Repairing of tower light at KumardihiA colliery entrance and fitting of lights at Tilaboni old SSP entrance under Bankola Area.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
44
ECL/GM/BA/E-TENDER/24-25/Enm/67, dt. 28-Jun-2024
Supply and Installation of HT Cable Joint Kit at Different places under Bankola Area.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
45
ECL/GM/BA/E-TENDER/24-25/Enm/66, dt. 28-Jun-2024
Cradle Guard installation at overhead line at different capacities 550V 440V under Bankola Area.
28-Jun-2024
08-Jul-2024 upto 18:00 Hrs.
09-Jul-2024 at 18:00 Hrs.
46
GM/Kaj/AE(EnM)/e-Tender/24-25/10, dt. 28-Jun-2024
Repairing of Hyd.Pump-01 no.,Service control valve-01 no., Drill extension cylinder - 01 no. of EIMCO ELECON make UDM M/c no. 611- 153 & Hyd. pump- 01 no., Service control valve- 01 no.,Drill Extension cylinder - 01 no.s of Simplex make UDM M/C no. - D138/5M-163 of 6 no. pit of Khas Kajora colliery, Kajora Area, ECL.
28-Jun-2024
15-Jul-2024 upto 17:00 Hrs.
16-Jul-2024 at 11:00 Hrs.
47
GM/Kaj/AE(EnM)/e-Tender/24-25/09, dt. 28-Jun-2024
OH line 3.3KV line diversion and extension of OH line near new colony dumping site at Jambad OCP, Kajora Area, ECL.
28-Jun-2024
15-Jul-2024 upto 17:00 Hrs.
16-Jul-2024 at 11:00 Hrs.
48
GM/Kaj/AE(EnM)/e-Tender/24-25/08, dt. 28-Jun-2024
Replacement of pole at new colony at Jambad Colliery, Kajora Area, ECL.
Leasehold boundary survey by aerial scanning at Chapuikhas Colliery including preparation of detail surface map to know the current surface status like built-up area classifying single storied, double storied, hutment, semi pucca, pit borehole, classifying electric line (H.T.).
28-Jun-2024
09-Jul-2024 upto 17:00 Hrs.
11-Jul-2024 at 10:00 Hrs.
50
SSA/GM/AMPCD/24-25/RB/SI/103/86, dt. 26-Jun-2024
Permanent Support by Roof bolting along Travelling & Haulage roadway of new proposed depillaring panel-21 at Satgram Incline.
28-Jun-2024
09-Jul-2024 upto 17:00 Hrs.
11-Jul-2024 at 10:00 Hrs.
51
ECL/GM/JNR/Tender/Min.B/24-25/17, dt. 28-Jun-2024
Calibration of Instrument at Jhanjra Area Laboratory.
28-Jun-2024
11-Jul-2024 upto 17:00 Hrs.
12-Jul-2024 at 13:00 Hrs.
52
ECL/GM/JNR/Tender/Min.B/24-25/16, dt. 28-Jun-2024
Stage Preparation for Mine visit for VVIP with Pit Safety Committee and JCC Members at Jhanjra Project Colliery.
28-Jun-2024
11-Jul-2024 upto 17:00 Hrs.
12-Jul-2024 at 13:00 Hrs.
53
ECL/GM/JNR/Tender/Min.B/24-25/15, dt. 28-Jun-2024
Stage Preparation and other auxillary works for visit of VVIP at Jhanjra Project Colliery.
28-Jun-2024
11-Jul-2024 upto 17:00 Hrs.
12-Jul-2024 at 13:00 Hrs.
54
ECL/BC/E&M/TENDER/2024-2025/09, dt. 26-Jun-2024
Rewinding of 01 No 12.5HP, 550Volt, 720RPM Electric Motor of ROTO Pump at Bansra Colliery under Kunustoria Area.
28-Jun-2024
18-Jul-2024 upto 11:00 Hrs.
18-Jul-2024 at 12:30 Hrs.
55
ECL/GM/JNR/Min.A/24-25/09, dt. 28-Jun-2024
Roof Support using girders & RCC precast blocks at junction of 21 D/62L of R VII seam at 3&4 incline under JPC.
28-Jun-2024
16-Jul-2024 upto 17:00 Hrs.
17-Jul-2024 at 11:00 Hrs.
56
ECL/PWS/T/24-25/01, dt. 27-Jun-2024
Repairing of 25 HP, 440 Volt, 2900 RPM, 50 mtr head 3 stage Submersible Pump Motor (Pullen make) at Poniati Workshop.
28-Jun-2024
11-Jul-2024 upto 11:00 Hrs.
11-Jul-2024 at 15:30 Hrs.
57
GM/PND/AE(E&M)/2024-25/19/205, dt. 28-Jun-2024
Installation of One HT Pump for dewatering in R-IV seam of Khottadih colliery.
Lifting & lowering of submersible pump 120m head, 600GPM, 550V KSB make complete set with power cable & 6inch dia MS pipe 18 nos at Naba Kajora Colliery.
28-Jun-2024
12-Jul-2024 upto 13:00 Hrs.
12-Jul-2024 at 15:30 Hrs.
69
MDP/AGT/E&M/TN/2024-25/35, dt. 27-Jun-2024
Rewinding/Repairing of 50 HP,550V Kirloskar Make Submersible Pump with Motor Set of Madhaipur Colliery.
28-Jun-2024
03-Jul-2024 upto 10:00 Hrs.
04-Jul-2024 at 10:00 Hrs.
70
MDP/AGT/E&M/TN/2024-25/34, dt. 27-Jun-2024
Repairing of 120 HP, 1480 RPM,550V 3 PH induction Motor.
Dismantling of Becunder make haulage complete with motor, bed plate, starter cable, controller, and return pulley at 67D/53XL, Transportation of the same to 77D/53-54XL at Nimcha unit of Nimcha ®Colliery under Satgram Sripur Area.
Trimming trees over different overhead line and substation at Bhanora west Block Colliery, Bhanora West OCP and Bhanora Old Colliery of Bhanora West Block Colliery under Satgram Sripur Area.
Supply and Installation of winding temperature meter Oil temperature meter and renovation of Buccholz relay protection system with alarm for 1 MVA 11KV/3.3KV power transformer installed at Amkola substation of Nimcha®Colliery under Satgram Sripur Area.
Miscellaneous electrical jobs at hospital substation, colony substation, cable jointing & repair of starter & fixing tyre coupling of pumpetc.
27-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 15:30 Hrs.
111
SS/GM/AMPCD/24-25/RS/NGM/19, dt. 26-Jun-2024
Roof fall cleaning & stacking in regular stack at 10th dip/14th level of Dishergarh seam at Ningha Colliery.
27-Jun-2024
09-Jul-2024 upto 17:00 Hrs.
10-Jul-2024 at 11:00 Hrs.
112
SS/GM/AMPCD/TEND/24-25/18, dt. 25-Jun-2024
Dump stability determination for Highwall mining and Amkola OCP Extn. Under Nimcha(R) Colliery.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
113
SS/GM/AMPCD/TEND/24-25/17, dt. 25-Jun-2024
Establishment and marking of cardinal point of NimchaHighwall project under Nimcha ® Colliery.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
114
SS/GM/AMPCD/TEND/24-25/16, dt. 25-Jun-2024
Celebration of world environment day week-2024 under Satgram-Sripur Area.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
115
SS/GM/AMPCD/TEND/24-25/15, dt. 25-Jun-2024
Initial survey plan preparation along the railway track for subsidence monitoring on very urgent basis.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
116
SS/GM/AMPCD/TEND/24-25/14, dt. 25-Jun-2024
Initial survey and base plan preparation along the northern part of railway track/northern part of Kuardi-Tirat Colliery leasehold boundary for subsidence monitoring on very urgent basis.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
117
SS/GM/AMPCD/TEND/24-25/13, dt. 25-Jun-2024
Initial survey and base plan preparation along the northern part of railway track/southern part of Ratibati Colliery leasehold boundary for subsidence monitoring on very urgent basis.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
118
SS/GM/AMPCD/TEND/24-25/12, dt. 25-Jun-2024
Capturing Aerial imagery to know the current status of the surface at Ningha OCP and establishment of cardinal points on ground in connection with NG station.
27-Jun-2024
04-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 15:00 Hrs.
119
SS/GM/AMPCD/TEND/24-25/11, dt. 25-Jun-2024
Drone survey to measures the surface RL along the south west side of Railway track line at Kalipahari leasehold area of distance about 1.5 km under Satgram-Sripur Area of M/s ECL.
Cleaning of garland drain over goved area over the panel 13-18, 21 & 22 at Bejdih Mouza near Binod Bandh under Chinakuri Mine-03 of CKI-SDP® Group, Sodepur Area.
27-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
04-Jul-2024 at 15:00 Hrs.
122
ECL/GM/MA/CE/24-25/e-Tender/159, dt. 24-Jun-2024
Repairing of 03 units B type quarter inside and outside (B/01/01, 01/02 and 01/03) at Gopalpura Township under Mugma Area.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
123
ECL/GM/MA/CE/24-25/e-Tender/158, dt. 24-Jun-2024
Repairing of 03 units D type quarter (D-5, D-6 and D-10) at Gopalpura Township under Mugma Area.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
124
ECL/GM/MA/CE/24-25/e-Tender/157, dt. 24-Jun-2024
Deeping of garland drain at Hume pipe culvert to Barakar Rive under BOCP.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
125
ECL/GM/MA/CE/24-25/e-Tender/156, dt. 24-Jun-2024
Construction of funnel at stowing bunker under Lakhimata Group of Mines.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
126
ECL/GM/MA/CE/24-25/e-Tender/155, dt. 24-Jun-2024
Construction of tippler shed at Kumardhubi Colliery under Mugma Area.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
127
ECL/GM/MA/CE/24-25/e-Tender/154, dt. 24-Jun-2024
Construction of Hume pipe culvert at Nirsa OCP under Lakhimata Group of Mines.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
128
ECL/GM/MA/CE/24-25/e-Tender/153, dt. 24-Jun-2024
Engagement of water tanker (5000 ltr.) for water spraying in coal transport road in Badjna Colliery.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
129
ECL/GM/MA/CE/24-25/e-Tender/152, dt. 24-Jun-2024
Construction of RCC drain at southern area above the mine at Nirsa Colliery under Lakhimata Group of Mines.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
130
ECL/GM/MA/CE/24-25/e-Tender/151, dt. 24-Jun-2024
Supply of earth and sand for making gully matti at 31 no incline under Badjna Colliery for season 2024-25.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
131
ECL/GM/MA/CE/24-25/e-Tender/150, dt. 24-Jun-2024
Repairing of gullimatti shed and black smith room in Kali matti incline under Chapapur Colliery.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
132
ECL/GM/MA/CE/24-25/e-Tender/149, dt. 24-Jun-2024
Construction of drain at Kalimati Colony under Lakhimata Colliery
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
133
ECL/GM/MA/CE/24-25/e-Tender/148, dt. 24-Jun-2024
Cleaning of pond (old quarry) at Nirsa OCP under Lakhimata Group of Mines.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
134
ECL/GM/MA/CE/24-25/e-Tender/147, dt. 24-Jun-2024
Heightening of cap lamp room, tendal room, EandM room, store and fixing profile sheet along with allied civil work at Lakhimata Colliery under Lakhimata Group of Mines.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
135
ECL/GM/MA/CE/24-25/e-Tender/146, dt. 24-Jun-2024
Heightening of boundary wall and new partition wall of store at BL incline under Kumardhubi Colliery.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
136
ECL/GM/MA/CE/24-25/e-Tender/145, dt. 24-Jun-2024
Construction of R.C.C boundary wall in East side of coal depot No. 8 of ROCP under Mugma Area.
26-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
137
ECL/NKC/MGR/24-25/47, dt. 25-Jun-2024
Sealing and making platform M.S joist for installation of submersible pumps at no. 1 Pit of Naba Kajora Colliery.
Servicing ( wet type / complete servicing ) of different make ( Voltas , logicool hitech & carrier ) air condition s running at The Gust house , Transit hostel , Gulmohor club and Different office rooms under Bankola Area.
Installation of 4inch (100 mm ) size U bend with steam trap assembly on steam pipe line at Tilaboni Colliery near no 1 pit Tilaboni unit under Bankola Area.
Cleaning drain around the incline no-1 and incline no-2 and bush cutting during monsoon along mine boundary at CKI-3 under CKI-SDP® group, Sodepur Area
Part Rep (2 Limp) of 500 KVA, 11 KV/440V Transformer.
26-Jun-2024
02-Jul-2024 upto 12:30 Hrs.
03-Jul-2024 at 10:30 Hrs.
184
ECL/SLN/GB/E&M/Tender/24-25/10, dt. 22-Jun-2024
Pole numbering, barbed wire fencing of pole & fitting of nameplate at different location of GourangdiBegunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
185
ECL/SLN/GB/E&M/Tender/24-25/09, dt. 22-Jun-2024
Upgradation of 400A, 11KV CG make Oil Circuit Breaker (OCB) at Gourangdi Begunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
186
ECL/SLN/GB/E&M/Tender/24-25/08, dt. 22-Jun-2024
Drawing & shifting of 3.3KV grade Overhead line which is feed power from Kashidanga 11KV substation to palasthali pumping station at Gourangdi Begunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
187
ECL/SLN/GB/E&M/Tender/24-25/07, dt. 22-Jun-2024
Upgradation of 11KV Transzie make VCB 200A all main at 9 No. electrical sub-stationat Gourangdi Begunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
188
ECL/SLN/GB/E&M/Tender/24-25/06, dt. 22-Jun-2024
Repairing of Neutral Grounding Resistance for system voltage 3300V of main Sub-station at Gourangdi Begunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
189
ECL/SLN/GB/E&M/Tender/24-25/05, dt. 22-Jun-2024
Supply & Re-installation of chemical earthing arrangement at Palashtali 3.3KV Electrical Sub-station of Gourangdi Begunia Colliery, Salanpur Area.
26-Jun-2024
03-Jul-2024 upto 13:00 Hrs.
03-Jul-2024 at 15:30 Hrs.
190
ECL/SLN/GB/E&M/Tender/24-25/04, dt. 22-Jun-2024
Repairing of 400W x 230V, HPSV light set at various location of Gourangdi Begunia Colliery, Salanpur Area.
A. Repairing of 04 Nos. of Track Roller assy. UDM Machine. B. Repairing of 05 Nos. of Track Roller assy. UDM Machine. C. 01 Nos. of Retainer fitting for Recoil Spring For SDL m/c.
Installation of proper earth continuity system at different equipment of Bonbahal R- VII seam of PSC(West) Colliery.
25-Jun-2024
09-Jul-2024 upto 13:00 Hrs.
09-Jul-2024 at 15:30 Hrs.
204
ECL/HQ/GM(C)/e-Tender/24-25/05, dt. 25-Jun-2024
Comprehensive annual maintenance and upkeeping of ECL HQ campus including Administrative Building, Technical Building, Canteen, CVO office and Environment office at Barachak for 730 day under ECL HQ- Retender.
1. 6inch MS Pipeline – 72Mtr vertical lowering & fitting and 156 Mtr horizontal pipeline laying and fitting at New constructed shed at pumping site, Barmuri OCP, 2. Pump-motor (1000GPM-3.3kV) set with all associated item and starter, 60Drum Pontoon dismantling from ItaPara OCP, 3. Defective Pump dismantling and repair pump changing and fitting on Pontoon no. 02, Barmuri OCP.
25-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 10:00 Hrs.
207
GM/SLN/E&T/Quotation/24-25/43, dt. 24-Jun-2024
Replacement of boom barrier arm for Barrier machine at Road WBs of Mohanpur (WB-2 & WB-1), Begunia WB-2 and Dabor WB-2 under Salanpur Area.
Repairing of 3.3KV, 400 Amps,Electroteknica make VCB, Sl No-SP/O/1333 of Badjna Colliery under Mugma Area.
25-Jun-2024
08-Jul-2024 upto 12:30 Hrs.
10-Jul-2024 at 10:30 Hrs.
209
ECL/MB/E&M/TENDER/2024-25/05, dt. 25-Jun-2024
Supply and fitting of cradle guard at 3.3KV and 440V Overhead line at Narayankuri HW Project of Mahabir Colliery under Kunustoria Area.
25-Jun-2024
19-Jul-2024 upto 12:00 Hrs.
19-Jul-2024 at 16:00 Hrs.
210
ECL/MB/E&M/TENDER/2024-25/04, dt. 25-Jun-2024
Maintenance of 3.3KV and 440V Overhead line installed under Mahabir Colliery under Monsoon Preparation activities 2024-25.
25-Jun-2024
19-Jul-2024 upto 12:00 Hrs.
19-Jul-2024 at 16:00 Hrs.
211
ECL/KND/QN/24-25/04, dt. 24-Jun-2024
Various miscellaneous electrical job at various location(Kenda Area Complex, Kenda Area Guest House and Shatabdi Club) of Kenda Are.
25-Jun-2024
03-Jul-2024 upto 10:00 Hrs.
03-Jul-2024 at 12:00 Hrs.
212
ECL/MB/E&M/TENDER/2024-25/03, dt. 25-Jun-2024
3 Phase 440V Electrical connection along with Energy Meter for Continuous Ambient Air Quality Monitoring Station(CAAQMS) at Mahabir (R) Colliery under Kunustoria Area.
Painting of Head gear structure of Pit No-1 of Kunustoria Colliery.
• CORRIGENDUM
25-Jun-2024
06-Jul-2024 upto 15:00 Hrs.
08-Jul-2024 at 15:30 Hrs.
214
ECL/GM/KNT/CIVIL/GeM/24-25/404, dt. 24-Jun-2024
Day-to-day operation and maintenance of 10,000 GPH Pressure Filter Plant (near Agent Office) for 8 months at Parasea Colliery under Kunustoria Area. (2nd Call).
25-Jun-2024
NA
05-Jul-2024 at 11:30 Hrs.
215
ECL/RJML/AE(E&T)/24-25/E-Ten/045, dt. 13-Jun-2024
AMC for day-to-day related work maintenance like alignment of VHF antenna cleaning and tightening of power wire/ joint/ connection and other rectify small problem for VHF Radio installed in HEMM and section.
25-Jun-2024
NA
09-Jul-2024 at 17:30 Hrs.
216
ECL/RJML/AE(E&T)/24-25/E-Ten/039, dt. 13-Jun-2024
Repairing/replacement of damaged telephone cable from CHP Admin building to Silo and NTPC Office ROCP.
A. AMC of fully electronic Pitless type 60T Road weigh bridge for the period of one year from the date of issue of workorder or from 20-07-2024 to 21-07-2024 at Rajpura OCP.
Clraning of garland drain (kachha) 980m length from Near byBishamburi Mandar to old coal depot side by Along the D.B road south side of Mohnpur OCP under Salanpur Area.
25-Jun-2024
03-Jul-2024 upto 17:00 Hrs.
04-Jul-2024 at 15:00 Hrs.
220
ECL/SBP/PE/EXCV/OTN/24-25/06, dt. 23-Jun-2024
Repairing of 01no Power Tilt Cylinder, pin and mounting.
Supply and Installation of external surge protection system at Kunustoria Area.
25-Jun-2024
15-Jul-2024 upto 17:00 Hrs.
16-Jul-2024 at 11:00 Hrs.
225
ECL/GM/BA/E-TENDER/24-25/Enm/65, dt. 24-Jun-2024
Supply and installation of audiovisual warning system at different locations of underground of bankola Colliery under bankola area.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
226
ECL/GM/BA/E-TENDER/24-25/Enm/64, dt. 24-Jun-2024
Overhauling of Lancashire boiler WBL10438 at Shyamsundarpur Colliery.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
227
ECL/GM/BA/E-TENDER/24-25/Enm/63, dt. 24-Jun-2024
Complete repairing and rewinding of 90KW M and P make 1470RPM 550Volt FLP Motor of Millennium Incline under Shankarpur Colliery.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
228
ECL/GM/BA/E-TENDER/24-25/Enm/62, dt. 24-Jun-2024
Lowering and lifting of Submersible pumps in Bore no.4 of CM project and bore hole no.1 and 2 of C and E pit at Nakrakonda Kumardihi Bcolliery under Bankola area.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
229
ECL/GM/BA/E-TENDER/24-25/Enm/61, dt. 24-Jun-2024
Different types of workshop jobs at Tilaboni pit and SSP OLD unit at Tilaboni Colliery under Bankola Area.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
230
ECL/GM/BA/E-TENDER/24-25/Enm/60, dt. 24-Jun-2024
Repairing of 08(Eight) nos. damaged coal tubs from old rejected coal tubs at No. 2 Pit of Tilaboni Colliery.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
231
ECL/GM/BA/E-TENDER/24-25/Enm/59, dt. 24-Jun-2024
1(one) no 6 stage pump complete set transporting from Colliery workshop to Escape route site and installation the same and one tagger haulage complete set, SDL machine with electric shifting at No8 pit old section to new section.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
232
ECL/GM/BA/E-TENDER/24-25/Enm/58, dt. 24-Jun-2024
Shifting of two nos. SDL machine with electrical, cables etc and one voldurm make tugger haulage from 19L12D to 19L18d site and installation the same and one 4up3 pump complete set from 28D3L to 18L23D site and installation the same at No2 incline of Bankola Colliery.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
233
ECL/GM/BA/E-TENDER/24-25/Enm/57, dt. 24-Jun-2024
Lowering of 02 (two) nos. of guide rope (32 mm dia.) at northeast position of 30 north side & north-west position of north cage at 3 and 4 no pit of Shankarpur Colliery Under Bankola Area.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
234
ECL/GM/BA/E-TENDER/24-25/Enm/56, dt. 24-Jun-2024
Repairing of 6 nos. of small motors for roto pump (R10D pumps) of KumardihiA Colliery under bankola area.
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
235
SLN/GM/AE(C)/E-Tender/24-25/16, dt. 22-Jun-2024
Installation of 02 nos Boring with submersible pump at Baliapur village under Itapara Gram Panchayat under NCRAP.
24-Jun-2024
06-Jul-2024 upto 10:00 Hrs.
08-Jul-2024 at 10:00 Hrs.
236
ECL/PC/E&M/TENDER/2024-25/08, dt. 20-Jun-2024
Work for repairing of 800 Amps GEC make OCB switch of Parasea colliery.
24-Jun-2024
NA
12-Jul-2024 at 16:30 Hrs.
237
GM/BA/Sand trans/24-25/04, dt. 24-Jun-2024
Sand Transportation from Sidha Ghat, Ramnagar Ghat and Pirthan Ghat to Bunker No. 6 of Sankalpkhani Sand Bunker Bankola Colliery for 03 Months.
24-Jun-2024
NA
09-Jul-2024 at 19:30 Hrs.
238
ECL/ANC/Agent/24-25/E&M/NIT/03, dt. 21-Jun-2024
Repairing of 3.3KV, 400Amps OCB of Amritnagar Colliery.
Recommissioning of 60 M.T. old SSPur Road Weighbridge at Tilaboni Colliery under Bankola Area(re-tender).
24-Jun-2024
04-Jul-2024 upto 16:00 Hrs.
05-Jul-2024 at 16:00 Hrs.
240
ECL/GM/JNR/Tender/Min.B/24-25/14, dt. 24-Jun-2024
Removal of depressed zone water by diesel pump at POCP siding at Jhanjra Project Colliery.
24-Jun-2024
08-Jul-2024 upto 17:00 Hrs.
09-Jul-2024 at 13:00 Hrs.
241
GEM/2024/B/5083336, dt. 24-Jun-2024
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3).
24-Jun-2024
NA
15-Jul-2024 at 11:30 Hrs.
242
GEM/2024/B/5069549, dt. 20-Jun-2024
Digital Radio Communication System (Walkie Talkie) complete set with all essential accessories.
24-Jun-2024
NA
10-Jul-2024 at 17:30 Hrs.
243
GEM/2024/B/5029869, dt. 24-Jun-2024
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3).
24-Jun-2024
NA
15-Jul-2024 at 09:30 Hrs.
244
ECL/RJML/AE(E&M)/24-25/E-Ten/032, dt. 06-Jun-2024
AMC for maintenance, removal of dust and muck etc. from the surrounding area of equipment in Silo Section of Rajmahal CHP.
24-Jun-2024
NA
02-Jul-2024 at 17:30 Hrs.
245
ECL/RJML/AE(E&M)/24-25/E-Ten/030, dt. 06-Jun-2024
Annual Maintenance of daily checking, repairing/ replacement of rollers, roller brackets, deck plate, stringer, leg, supporting stringer with leg & other related jobs of Reclaim Conveyor belt (C-16, C-17, C-18 and C-19) at Rajmahal CHP for 12 (Twelve) Months
24-Jun-2024
NA
01-Jul-2024 at 17:30 Hrs.
246
ECL/RJML/AE(E&M)/24-25/E-Ten/029, dt. 06-Jun-2024
AMC for maintenance of throat plate, supporting beam, plough feeder travelling track, lip angle, canopy and jobs of passage of plough feeder in Ground Bunker Tunnel, Motor and gear boxes of the drive houses of Reclaim Section at CHP for one year.
24-Jun-2024
NA
01-Jul-2024 at 17:30 Hrs.
247
ECL/SPM/E&M/e-NIT/1-8/26, dt. 11-Jun-2024
Supply, installation & commissioning of 100 Te Road weighbridge at Mine site of Chitra colliery.
24-Jun-2024
11-Jul-2024 upto 17:00 Hrs.
12-Jul-2024 at 17:00 Hrs.
248
ECL/RJML/AE(E&M)/24-25/E-Ten/026, dt. 06-Jun-2024
Maintenance, daily checking, repairing/replacement of bearing, block, conveyor pulley, gear box, motor, roller bracket, deck plate, stringer leg, supporting stringer with leg cleaning and other related jobs Storage Section (Conveyor belt C-14 & C-15) and ground bunker cleaning for one year.
Drilling and commissioning of 01 nos bore well all complete fitting along with pump house and laying pipeline for connection near plot no.741 at Lohandia rehab site, under Rajmahal Area.
Drilling and commissioning of 02 nos. submersible pump along with hand pump near (plot no. 385 and 397) at Hijukita rehab site under Rajmahal Area.
24-Jun-2024
01-Jul-2024 upto 18:55 Hrs.
03-Jul-2024 at 12:00 Hrs.
251
ECL/SPM/E&M/e-NIT/1-8/24, dt. 11-Jun-2024
Shifting. Strengthening. restoring & repairing of the installed surveillance system under S.P Mines Area for monitoring of Security department S.P Mines Area.
24-Jun-2024
06-Jul-2024 upto 17:00 Hrs.
08-Jul-2024 at 17:00 Hrs.
252
ECL/RJML/AE(E&M)/24-25/E-Ten/024, dt. 06-Jun-2024
AMC for operation, minor repairing of belt trailing, cable handling, greasing and lubrication of tripper conveyor C-14/ C-15 of Rajmahal CHP in all three shifts.
24-Jun-2024
NA
01-Jul-2024 at 17:30 Hrs.
253
ECL/RJML/AE(E&M)/24-25/E-Ten/023, dt. 06-Jun-2024
AMC for maintenance, daily checking, repairing replacement of conveyor pulley, bearing, block, sleeve, discharge chute, take-up/counter weight lowering/lifting and other related work of Reclaim Section (Conveyor belt C- 16, C-17, C-18 & C-19) for One year.
24-Jun-2024
NA
01-Jul-2024 at 17:30 Hrs.
254
ECL/RJML/AE(E&M)/24-25/E-Ten/022, dt. 06-Jun-2024
AMC for maintenance of the area of sumps and drain along the path of C-16 C-17 belt conveyor in all three shifts at Rajmahal CHP.
Shifting & installation of one no 11KV/440V/500KVA transformer, one no 11KV/800Amp VCB & other electrical jobs at Kali Mandir substation of NSOCP under Kunustoria area.
Re-rimming of old borewell located at Mohanpur pressure filter near Agent office Mohanpur OCP, under Salanpur Area.
24-Jun-2024
02-Jul-2024 upto 17:00 Hrs.
03-Jul-2024 at 15:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL