Supply & installation and commissioning of restricted neutral grounding monitoring system of 01 no 750 KVA 11KV /3.3KV Surface transformer deployed at VK unit substation at Khandra Colliery under Bankola Area (retender)
10-Dec-2025
22-Dec-2025 upto 09:00 Hrs.
23-Dec-2025 at 09:00 Hrs.
93
ECL/GM/BA/E-Tender/25-26/EXC/05, dt. 10-Dec-2025
Repairing/Replacement of gearbox and misslenious work of departmental Service Maintenance Van at Nakrakonda Kumardihi B OCP.
Strengthening of Head Gear structure as recommended in structural stability report of Pit No 01 n 03 of Kunustoria Colliery under Kunustoria Area.
10-Dec-2025
22-Dec-2025 upto 17:00 Hrs.
23-Dec-2025 at 11:00 Hrs.
95
ECL/GM/JNR/EnM/A2/25-26/102, dt. 08-Dec-2025
Installation of 6.6kV grade cable, 3.3kV grade cable with 550V ACB & drill panel for development of panel 11 in R-VIIA seam at LHCM-1 at 3&4 Incline, JPC.
• CORRIGENDUM
09-Dec-2025
21-Dec-2025 upto 11:00 Hrs.
23-Dec-2025 at 11:00 Hrs.
96
ECL/GM/JNR/EnM/A2/25-26/101, dt. 08-Dec-2025
Transportation, installation, necessary fabrication, commissioning & trial run including extension of one no. 1000mm width, 2X150kW, 6.6kV, double drive belt conveyor along 59L from 8D to 22D in R-VII seam at 3&4 Incline, J.P.Colly.
• CORRIGENDUM
09-Dec-2025
21-Dec-2025 upto 11:00 Hrs.
23-Dec-2025 at 11:00 Hrs.
97
ECL/GM/JNR/EnM/A2/25-26/100, dt. 08-Dec-2025
Transportation and installation of Six reels (1200 mtr.) 1200mm belt in 1st and 3rd belt conveyors(Main Incline) running at 3&4 Incline unit, J.P.Colly.
• CORRIGENDUM
09-Dec-2025
21-Dec-2025 upto 11:00 Hrs.
23-Dec-2025 at 11:00 Hrs.
98
ECL/GM/JNR/EnM/A2/25-26/99, dt. 08-Dec-2025
Cleaning Of Spillage Coal, Slush, Slurry, Etc. in general shift, mechanical maintenance and miscellaneous work like shifting/rehandling of top and bottom rollers, brackets, channels, foot stools, gas cylinder, welding machine, pressure drums, pressure rollers etc and necessary structure realignment, chute rectification or fabrication, scrapper making or rectification, skirt plate rectification, fencing arrangement maintenance, pull cord switch,signaling wire, sequence cable maintenance etc. in General shift along with emergency work like drum changing or belt jointing in back shift and general shift of 1400mm 1st, 1400mm 2nd and 1400mm 3rd belt along belt incline at UG of MIC unit of J.P.Colly.
Carrying, laying, & fitting 6inch MS pipe for pumping of western portion at kendatop seam of Kunustoria colliery.
09-Dec-2025
17-Dec-2025 upto 13:00 Hrs.
17-Dec-2025 at 15:00 Hrs.
100
KOCP/E&M/TN/25-26/07, dt. 08-Dec-2025
Repairing of 3 Nos. of 48 barrel pontoon for dewatering of Main sump under KOCP.
09-Dec-2025
19-Dec-2025 upto 10:00 Hrs.
19-Dec-2025 at 11:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL