REPAIRING OF 12 (TWELVE) NOS.WORN-OUT CUTTING EDGE CENTRE (BOTH TOP & BOTTOM EDGE) & 08 (EIGHT) NOS. EACH LH & RH END BIT (ONLY BOTTOM EDGE) OF KOMATSU WHEEL DOZER NO.WD-95 OF RAJMAHAL PROJECT.
01-Jul-2025
10-Jul-2025 upto 09:00 Hrs.
11-Jul-2025 at 09:00 Hrs.
314
GM/JNR/E&M/B2/TENDER/25-26/29, dt. 26-Jun-2025
Installation of 250 mtr. trackline for materials transportation upto 75L Pump Sump in R-VIIA seam, 3&4 Incline, JPC.
01-Jul-2025
17-Jul-2025 upto 11:00 Hrs.
17-Jul-2025 at 11:30 Hrs.
315
GM/JNR/E&M/B2/TENDER/25-26/30, dt. 26-Jun-2025
Complete repairing/rewinding of 02 Nos. Air Cooled Type 30KVA Welding Transformer 550V/80V-100V, CC.NO. 509 & 514 under Jhanjra Area.
01-Jul-2025
17-Jul-2025 upto 11:00 Hrs.
17-Jul-2025 at 11:30 Hrs.
316
GM/JNR/E&M/B2/TENDER/25-26/31, dt. 26-Jun-2025
Repairing of worn out/damaged loop take up structure by dismantling, fabrication etc of 1200mm Steel cord belt conveyor of MIC,JPC.
01-Jul-2025
17-Jul-2025 upto 11:00 Hrs.
17-Jul-2025 at 11:30 Hrs.
317
ECL/GM/JNR/EnM/A2/25-26/27, dt. 26-Jun-2025
Repairing of one Nos. Kirloskar Make pumps MLA-3 Stage(90 meter head) and Pulro- 3 Stage(90 meter head) M&P Make under Jhanjra Project Colliery.
01-Jul-2025
15-Jul-2025 upto 11:00 Hrs.
16-Jul-2025 at 11:00 Hrs.
318
GM/JNR/E&M/B2/TENDER/25-26/28, dt. 26-Jun-2025
Repairing of Street Light near magazine towards 3&4 Incline of Jhanjra Project Colliery.
Cleaning and removing sludge, liquid mud, desilt, sandy soil, eart, silt debriases etc from Garland drain from Chhota Simra village to the end of compound wall at ROCP.
01-Jul-2025
08-Jul-2025 upto 18:55 Hrs.
09-Jul-2025 at 12:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL