Kacha drain cutting and moorum dressing surrounding sarpi under shyamsundarpur Colliery.
12-Aug-2025
NA
21-Aug-2025 at 13:00 Hrs.
853
SLN/EXCV/25-26/NIT/18/119, dt. 11-Aug-2025
Repairing LHS carrier roller foundation and carrier roller holding mounting bracket of CK300 shovel sl no- B784 of Dabor OCP.
12-Aug-2025
01-Sep-2025 upto 13:00 Hrs.
01-Sep-2025 at 15:30 Hrs.
854
SLN/EXCV/25-26/NIT/19/120, dt. 11-Aug-2025
Repairing of track frame both side, removal of swing gear broken bolt, repairing of battery box, silencer & engine bonnet frame of BE300LC shovel sl no- 16111 of Dabor OCP.
12-Aug-2025
01-Sep-2025 upto 13:00 Hrs.
01-Sep-2025 at 15:30 Hrs.
855
SLN/EXCV/25-26/NIT/20/121, dt. 11-Aug-2025
Repairing of damaged track roller guards 1 set for D155 dozer sl no- 13491 at Dabor OCP.
Urgent repairing of backside wall for 4 unit of NHS quarter (No 07/99,07/100,07/110,07/109) along with some celling plaster of various quarters at NKJ and moira under Khandra Colliery.
Cleaning along the Haulage Roadway 55 X Cut Level from 2D to 26D with tub loading in (R – VIII ) Seam at No 3&4 Pits of Nimcha (R) Colliery under Satgram Sripur Area.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL